Leadership Guide

Funded to the Edge of the Valley

The round wasn't too small. It was sized to the wrong finish line.

Leadership Guide · Aug 2026 · MKA-42-LG
What the Framework Reveals

Why startups raise enough to prove the technology, and not enough to finish it

1
phase this guide covers: between proof of concept and a qualified product
2 yrs
typical gap between “the demo landed” and “still 18 months from a product”
0
conscious decisions behind most thesis dilution — it happens without anyone deciding to replace it

The science worked. The demo landed. The round closed. Two years later the company is still eighteen months from a product, the founding scientists have started leaving, and the pitch has quietly changed to something more achievable. This guide covers the phase between proof of concept and a qualified product — what it costs, why it breaks teams, what investors can and cannot verify.

Source: Leadership Guide · Aug 2026 · MKA-42-LG, Executive Summary
Quick Download

Get the full leadership guide.

Download the Leadership Guide →